Buses from Monumento to Quezon Avenue starts today

The Transportation Department will start today the interim operations of the EDSA Busway that will complement the operations of the MRT-3 line and its bus augmentation program.

The interim operation of the EDSA Busway aims to help transport commuters in Metro Manila amid the general community quarantine (GCQ) still being enforced to prevent the spread of COVID-19.

Covered by the interim operations of the EDSA Busway are bus stops from Monumento to the PITX.

Buses from Monumento to Quezon Avenue will be using the following bus stops located on the curbside for the meantime to pick-up and/or unload passengers:

Bagong Barrio

LRT Balintawak

Kaingin Road

LRT Muñoz Station

MRT North Avenue Station (Southbound-Loading only, Northbound-Unloading Only)

MRT Quezon Avenue Station (Southbound-Loading only, Northbound-Unloading Only)

Meanwhile, retaining the existing set up, buses will shift using the median lanes with the partial operability of the busway section from Quezon Avenue all the way to Estrella.

Then, upon exiting Estrella, buses will be allowed to pick-up and/or unload passengers at the following curbside stops from Buendia to the PITX:

Buendia

Ayala (Southbound-Unloading Only, Northbound-Loading and Unloading)

Magallanes

Evangelista/Malibay

Taft Avenue (Southbound-Unloading Only, Northbound-Loading Only)

Roxas Boulevard

Macapagal Avenue

SM Mall of Asia

PITX

550 bus units were authorized to service the EDSA Busway. Bus operators committed to initially deploy 150 bus units starting today. This is in addition to the buses deployed under the MRT-3 Bus Augmentation Program. No fare increase shall be implemented.

Buses will be using these curbside stops until the needed bus stops (including lighting, fences and canopies) are completed, and when the concrete barriers are placed on EDSA’s median lanes.

The DOTr has procured 36,000 concrete barriers for use in the EDSA Busway. Partial delivery of the barriers will start on July 2 to 7, 2020, and are expected to be completed by August or September this year.

To better assist commuters, the LTFRB will also be implementing a mini loop from Timog Avenue to Santolan, starting Thursday, July 2.

The Timog to Santolan mini loop will be serviced by shuttles or mini buses, and shall be allowed to pick up and drop off passengers at designated curbside stops.

The EDSA Busway aims to significantly cut travel time from Monumento to PITX from the usual 2 to 3 hours because of traffic, to just 45 minutes to 1 hour.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s